Next day delivery in store
Buy before 6pm to receive your order next day.FREE
Next day delivery
Orders before 6pm from Monday to Saturday (or before 1pm on Sunday) will be delivered Next working day (except Northern Ireland and Highlands). Orders placed after 6pm (after 1pm on Sunday) or for Northern Ireland and Highlands will be delivered in 2 working days.29 USD
Drop Point
In 2-3 working days. Pick up your parcel in one of the many diferent collection points available and during a wide range of hours.39 USD
Same day delivery in London:
Place your order before 13:00 to get it today!. If you order later on, you’ll receive it the next day and if you order on Sunday, you’ll receive it the next working day.59 USD
SHIPPING
Complimentary ground shipping within 1 to 7 business days In-store collection available within 1 to 7 business days Next-day and Express delivery options also available Purchases are delivered in an orange box tied with a Bolduc ribbon, with the exception of certain items See the delivery FAQs for details on shipping methods, costs and delivery timesDescription
Hayward GLX-CELLSTAND – Salt Cell Cleaning Stand
Product Overview
The GLX-CELLSTAND is a dedicated cleaning stand designed for use with Hayward Turbo salt cells. It screws directly into the cell body to allow a safe, controlled acid/water soak, eliminating the need to submerge or disassemble the entire cell. Ideal for preventive service and maintaining the efficiency and lifespan of your salt system.
Key Features
- Screws into Turbo salt cell bodies for a quick, clean soak process.
- Constructed of acid-resistant plastic for durability and chemical exposure.
- Allows you to add a measured acid/water mixture directly into the cell, reducing mess and downtime.
- Helps prolong the life of your salt cell by simplifying scale removal and maintenance.
Technical Specifications
- Part Number: GLX-CELLSTAND
- Material: Heavy-duty plastic (acid-resistant)
- Application: Compatible with Hayward Turbo salt cell systems
Installation & Use Instructions
- Turn off the circulation pump and shut off the salt system before servicing the cell.
- Remove the salt cell from the system and mount it vertically in a safe area.
- Thread the GLX-CELLSTAND into the cell’s port, securely seating it.
- Prepare an acid/water mixture (as recommended) and pour into the cell via the stand connection.
- Allow the mixture to sit until foaming subsides, then thoroughly rinse and reinstall the cell.
Troubleshooting & Maintenance Tips
- Foaming won’t start: Check that the stand is properly sealed and the acid mixture is correct.
- Acid smell or leaks: Confirm correct installation and that the material is intact—replace the stand if cracked.
- Cell performance not improving: If scale is severe, a full cell replacement may be needed even after soaking.
Maintenance Tip
Use the GLX-CELLSTAND each time you service the salt cell (typically every 3–6 months). Keeping your salt cell clean and well maintained helps maintain chlorine production efficiency, reduces downtime, and extends the life of the cell and system.

There are no reviews yet.